1. 尊龙凯时 - 人生就是搏!

        Global Success Stories

        Browse cutting-edge solar projects using TrinaTracker smart tracking solutions.

        tongchuan arrows

        TongChuan China

        LEARN MORE
        Australia arrows

        AustraliaClare

        128MW

        Maximum wind speed level 17

        The main challenge in this project was the wind speed. CLARE Solar Farm is located in Region C, this is a Cyclonic Region in Australia with 212 km/h (58,88 m/s) wind speed. The other critical issue was the ground composed by expansive clays with an active layer of 2 m in depth.

        Huanghe arrows

        ChinaHuanghe Hydropower

        477MW

        Gobi desert

        Huanghe 477MW EHV Project faced the challenge of logistic due to COVID-19 which greatly increased the risk of delivery delay. To meet the original COD deadline, the extra shipping time was required. The solution of this pressure was real-time logistic tracking and adding 3 logistics suppliers.

        Jordan arrows

        JordanFALCON

        23MW

        Uneven terrain

        Terrain slopes even higher than 20%, which required a customized mounting solution, adjusting the tables to the contour of the terrain with the purpose of reducing earth movements. In addition, fixed structure was designed for an allowable wind speed of 145mph (hurricane zone).

        spain arrows

        SpainCobra Solar Park

        190MW

        Mountain and hilly area

        United States arrows

        United StatesGrasshoper

        103MW

        Uneven terrain

        Chile arrows

        ChileCapricornio

        100MW

        Hot and humid area